ABE
PSU
Yewon Jang | Mechanical Option
Adviser: Dr. William Bahnfleth
Yewon Jang is currently in her 5th study in the Architectural Engineering Program at the Pennsylvania State University. In May 2019, she will graduate with an Integrated Bachelor / Master of Architectural Engineering Degree with a focus in mechanical systems and Architecture Studies minor. During past winter break, she interned at Smithgroup JJR in Washington DC. Yewon is a member of a number of professional and student organizations including Central PA chapter of the ASHRAE and Central PA chapter of Korean-American Scientist Engineer Association (KSEA). Yewon has passed the FE exam and will gain EIT status after her graduation.
Upon graduation, Yewon is looking forward to begin working as a mechanical design engineer for a consulting or AE firm to gain knowledge and practical experience in the field.
Outside of academics, Yewon is involved in university activities such as working as a desk clerk at the commons desk at residence halls since 2017. She enjoys traveling, experiencing new cultures, and listening to music.
About me
NEWS FEED
Fall Semester
Aug.2018 - Dec.2018
12.07 Proposal
11.16 Draft Breadth Topics
10.29 Tech Report 3
10.26 Abstract Color and Content
10.17 Building Statistics Part 2 - Posted on CPEP
10.01 Building Statistics Part 1- Posted on CPEP
09.28 Tech Report 2
09.14 Bio Sketch Peer Review & Correction
09.12 Resume Posted
09.12 Bio Sketch Posted
09.10 CPEP Website - Full Menu Functional
09.07 Tech Report 1
09.04 CPEP Home Page Draft
09.04 Mailed AE Dept. Thank You Letters to primary contacts
08.31 Building Statistics Part 1 - Electronic Copy
08.31 Career Fair Hosting/Event Assistance Sign up Complete
08.27 Resume Submitted for AE Career Fair listing
08.27 Obtained Project Documentation
08.27 Turned in Project Initiation Checklist Part 2
08.20 Confirmed Master List Information
08.20 Turned in Project Initiation Checklist Part 1
08.13 Owners Permission Received
Spring Semester
Jan.2019 - May.2019
00.00 Turned In with Studio Key
00.00 Final Thesis Checklist Complete
00.00 CPEP Site Ready for Final Review
00.00 Thesis Research CPEP Page Completed
00.00 ABET Assessment Chart & Reflection Completed
04.09 Presentation / Thesis Defense Completed
04.08 Final Presentation (PPT & PDF) Posted
04.01 Final Report - Posted
03.28 Progress Schedule Milestone 3 Accomplished
03.27 Presentation Outline - with Draft / Sample Slides
03.14 Progress Schedule Milestone 2 Accomplished
02.14 Progress Schedule Milestone 1 Accomplished
01.17 Spring Planning / Project Schedule 1st Submission
01.14 Approved / Updated Proposal