Technical Reports

System

Operation Description

Presentation
00-03437.00_AgEng_Prespective-section_ns

Renderings Courtesy of EYP Architecture.

SEPTEMBER 7, 2018

Tech Report 1

ASHRAE Std. 55 

& Std. 62.1

SEPTEMBER 28, 2018

Tech Report 2
section_perspective_looking east.jpg

Renderings Courtesy of EYP Architecture.

Design Load & Energy Calculation Report

OCTOBER 29, 2018

00-03437.00_AgEng_Prespective-section_ns
Tech Report 3

Renderings Courtesy of EYP Architecture.

NEWS FEED

Fall Semester

Aug.2018 - Dec.2018

 12.07     Proposal

 11.16     Draft Breadth Topics

 10.29     Tech Report 3

 10.26     Abstract Color and Content

 10.17     Building Statistics Part 2 - Posted on CPEP

 10.01     Building Statistics Part 1- Posted on CPEP

 09.28     Tech Report 2​

 09.14     Bio Sketch Peer Review & Correction

 09.12     Resume Posted

 09.12     Bio Sketch Posted

 09.10     CPEP Website - Full Menu Functional

 09.07     Tech Report 1

 09.04     CPEP Home Page Draft

 09.04     Mailed AE Dept. Thank You Letters to primary contacts

 08.31     Building Statistics Part 1 - Electronic Copy

 08.31     Career Fair Hosting/Event Assistance Sign up Complete

 08.27     Resume Submitted for AE Career Fair listing 

 08.27     Obtained Project Documentation

 08.27     Turned in Project Initiation Checklist Part 2

 08.20     Confirmed Master List Information

 08.20     Turned in Project Initiation Checklist Part 1

 08.13     Owners Permission Received

Spring Semester

Jan.2019 - May.2019

 00.00     Turned In with Studio Key

 00.00     Final Thesis Checklist Complete

 00.00     CPEP Site Ready for Final Review

 00.00     Thesis Research CPEP Page Completed

 00.00     ABET Assessment Chart & Reflection Completed

 04.09     Presentation / Thesis Defense Completed

 04.08     Final Presentation (PPT & PDF) Posted

 04.01     Final Report - Posted

​ 03.28     Progress Schedule Milestone 3 Accomplished 

 03.27     Presentation Outline - with Draft / Sample Slides

​ 03.14     Progress Schedule Milestone 2 Accomplished 

​ 02.14     Progress Schedule Milestone 1 Accomplished 

​ 01.17     Spring Planning / Project Schedule 1st Submission

 01.14     Approved / Updated Proposal

USEFUL
LINKS

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Yewon Jang. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.