This report is composition of two semester investigation of the Agricultural Engineering Building’s mechanical system. The overall goal of this thesis project was to research, analyze the existing mechanical system, propose alternatives and determine if the alternative systems should be recommended for existing condition.
The Agricultural Engineering Building is located in University Park, PA. Originally built in 1937, the Agricultural Engineering Building got a major renewal by keeping the building’s original facades and adding new spaces to the back with a modern feel. This 4 story building, including basement, is approximately 94,000 square feet and used mainly for the laboratory, classrooms and small portion of offices for the agricultural engineering department. The renewal cost for this building was $44 million, making the cost per square foot about $470.
Two alternatives are being proposed for this building, having central cooling and heating plant, instead of connect to campus chilled water and steam utility loop. The main study of the proposed design was to see if producing chilled and hot water on site would be cheaper than using campus utility loop. For central cooling plant, the air and water cooled chiller with cooling tower were studied and compared with energy usage and cost efficiency. Same process has been done for central heating system, the non-condensing and condensing boiler.
The breadth topics includes acoustic and daylighting. For acoustics breadth topic, the airborne and structure-borne sounds produced by air cooled chiller were studied and proposed with solutions to both problems. For daylighting topics, the research of the overhang type and study of utilizing overhangs on the south side of the building was done.
NEWS FEED
Fall Semester
Aug.2018 - Dec.2018
12.07 Proposal
11.16 Draft Breadth Topics
10.29 Tech Report 3
10.26 Abstract Color and Content
10.17 Building Statistics Part 2 - Posted on CPEP
10.01 Building Statistics Part 1- Posted on CPEP
09.28 Tech Report 2
09.14 Bio Sketch Peer Review & Correction
09.12 Resume Posted
09.12 Bio Sketch Posted
09.10 CPEP Website - Full Menu Functional
09.07 Tech Report 1
09.04 CPEP Home Page Draft
09.04 Mailed AE Dept. Thank You Letters to primary contacts
08.31 Building Statistics Part 1 - Electronic Copy
08.31 Career Fair Hosting/Event Assistance Sign up Complete
08.27 Resume Submitted for AE Career Fair listing
08.27 Obtained Project Documentation
08.27 Turned in Project Initiation Checklist Part 2
08.20 Confirmed Master List Information
08.20 Turned in Project Initiation Checklist Part 1
08.13 Owners Permission Received
Spring Semester
Jan.2019 - May.2019
00.00 Turned In with Studio Key
00.00 Final Thesis Checklist Complete
00.00 CPEP Site Ready for Final Review
00.00 Thesis Research CPEP Page Completed
00.00 ABET Assessment Chart & Reflection Completed
04.09 Presentation / Thesis Defense Completed
04.08 Final Presentation (PPT & PDF) Posted
04.01 Final Report - Posted
03.28 Progress Schedule Milestone 3 Accomplished
03.27 Presentation Outline - with Draft / Sample Slides
03.14 Progress Schedule Milestone 2 Accomplished
02.14 Progress Schedule Milestone 1 Accomplished
01.17 Spring Planning / Project Schedule 1st Submission
01.14 Approved / Updated Proposal